INTERVENTION
Restoration and conversion to the cruise ship terminal of 109/110 buildings inside the port area.
DESCRIPTION
Design and installation of electrical, special, air conditioning, water sanitary and fire prevention sprinkler systems. Maximum use of renewable energy: 20 kW solar panels, solar heating for domestic hot water, electric heat pumps with gas module. Total area of 15,000 m.
YEAR
2013-2014